Forward Tilting Along the Top
The top edge of the concrete leans outward past the vertical line. Saturated earth pushes against the stem when winter storms soak the upper bank, forcing the wall off plumb. Once the top tilts more than 2 inches, internal steel yields and the barrier cannot return to center.






